Heat Shrink Tunnel for Bottles, YOKO-RS-C
YOKO-RS-C product reference image. Final supplied configuration may vary.
Heat Shrink Tunnel for Bottles, YOKO-RS-C

YOKO-RS-C product reference image. Final supplied configuration may vary.

Supplied by YOKO

YOKO-RS-C

Heat Shrink Tunnel for Bottles

The YOKO-RS-C heat shrink tunnel for bottles is intended for bottle-bundle shrinking and secondary pack overwrapping. Selection is reviewed against compatible shrink film and grouped bottles or containers, target output, utilities, and line interfaces. Final configuration is defined in the quotation and technical agreement.

Reference capacity / range
Confirmed for the selected product and format
Dimensions
1500 × 350 × 1500 / 1500 × 350 × 1500 mm
Power
Configured for the destination electrical standard
Typical applicationBottle-bundle shrinking · Secondary pack overwrapping
Material or formatCompatible shrink film · Grouped bottles or containers

Equipment purpose

What this machine is designed to do

Shrinks compatible film around bottles or grouped products for secondary packaging and bundle stability.

Operating sequence

Working principle

Products travel through a temperature-controlled tunnel where heated airflow contracts the selected film around the package.

Review points

  • Application review covers bottle-bundle shrinking and secondary pack overwrapping.
  • Reference specifications include conveyor speed, size of shrink tunnel and power for model comparison.
  • Material and format review includes compatible shrink film and grouped bottles or containers.
  • Standalone or integrated supply scope is confirmed with utilities, guarding, interfaces, testing, and documentation.

Process fit

Applications and compatible materials

Use these references to frame the first technical discussion. Suitability is confirmed with actual material, format, and process data.

Typical applications

  • Bottle-bundle shrinking
  • Secondary pack overwrapping

Material or format references

  • Compatible shrink film
  • Grouped bottles or containers

Reference parameters

Technical specifications

Values are model references for initial selection. The quotation and approved technical agreement define the final supplied configuration.

Technical specifications

ModelYOKO-10RS-C / YOKO-10RS1-C
Size of Shrink Tunnel (L*W*H mm)1000 × 150 × 150 / 1000 × 150 × 380
Max. packing size (mm)Ø105 × 350H / Ø105 × 350H
Conveyor Speed (m/min)0-10 / 0-10
Loading Weight (kg)15 / 15
PowerConfigured for the destination electrical standard
Dimension (L*W*H mm)1500 × 350 × 1500 / 1500 × 350 × 1500
Weight (kg)90 / 96

Before quotation

Configuration inputs

A useful quotation starts with the product, container or format, target output, available utilities, and destination requirements.

  • Product path, size range, and change parts for the confirmed application
  • Product-contact or chamber materials for compatible shrink film and grouped bottles or containers
  • Destination electrical standard, control language, and utility interfaces
  • Upstream and downstream interfaces, guarding, testing, and documentation scope

Need a model-specific document?

Ask for the current datasheet, layout information, and available documentation package.

Request documents

Supporting files

Videos and technical documents

Availability varies by model and configuration. Request the current demonstration, datasheet, layout, or documentation package when needed.

Product video

Ask whether a current model demonstration is available.

Selection questions

Frequently asked questions

What information is needed to configure YOKO-RS-C?

Provide the Powders or other product characteristics, target sustained output, format or container details, utilities, destination standard, available space, and required documentation. YOKO uses these inputs to review the appropriate bag packing configuration.

How should the listed output for YOKO-RS-C be interpreted?

The final output range depends on the selected configuration. It is not a guaranteed production commitment. Sustained performance must be confirmed with the actual material, product format, operating conditions, and agreed acceptance criteria.

Can YOKO-RS-C be supplied for my destination standard?

Destination voltage, frequency, plug or wiring standard, control language, utilities, guarding, documentation, and any project-specific compliance requirements should be stated before quotation. The final supplied scope is defined in the approved technical agreement.

Model-level review

Request a configured quotation for YOKO-RS-C

Share the material, product format, target sustained output, available utilities, destination standard, and expected documentation scope.

info@sxyoko.com

Current equipment context

Equipment
Heat Shrink Tunnel for Bottles
Model
YOKO-RS-C
Category
Bag Packing

A short message is enough. Add product, capacity, or file details only if available.

By submitting, you agree to our Privacy Policy.