Product video
Ask whether a current model demonstration is available.
Supplied by YOKO
YOKO-CDC-J
The YOKO-CDC-J laminar flow pass box is intended for cleanroom material transfer and laboratory transfer. Selection is reviewed against components and tools, target output, utilities, and line interfaces. Final configuration is defined in the quotation and technical agreement.
Equipment purpose
Transfers materials between controlled areas while limiting direct airflow exchange.
Operating sequence
Interlocked doors and the selected cleaning or airflow features support staged transfer through the chamber.
Process fit
Use these references to frame the first technical discussion. Suitability is confirmed with actual material, format, and process data.
Reference parameters
Values are model references for initial selection. The quotation and approved technical agreement define the final supplied configuration.
| Model | YOKO-CDC-J |
|---|---|
| Sterilization | 18W ultraviolet germicidal lamp |
| Monitoring | 0-500Pa differential pressure gauge |
| Cleanliness | static class 100 (US 209E standard) |
| Power | Configured for the destination electrical standard |
| Fan System | dedicated fan with large air volume, the wind speed is adjustable at 0.45m/s±20% |
| Size (mm) | External: 1260W*1080D*1650HInner: 1000W*1000D*1000H |
Before quotation
A useful quotation starts with the product, container or format, target output, available utilities, and destination requirements.
Ask for the current datasheet, layout information, and available documentation package.
Request documentsSupporting files
Availability varies by model and configuration. Request the current demonstration, datasheet, layout, or documentation package when needed.
Ask whether a current model demonstration is available.
Model-specific operating manuals and layout files are supplied after configuration review.
Selection questions
Provide the Components or other product characteristics, target sustained output, format or container details, utilities, destination standard, available space, and required documentation. YOKO uses these inputs to review the appropriate pass box configuration.
The final output range depends on the selected configuration. It is not a guaranteed production commitment. Sustained performance must be confirmed with the actual material, product format, operating conditions, and agreed acceptance criteria.
Destination voltage, frequency, plug or wiring standard, control language, utilities, guarding, documentation, and any project-specific compliance requirements should be stated before quotation. The final supplied scope is defined in the approved technical agreement.
Model-level review
Share the material, product format, target sustained output, available utilities, destination standard, and expected documentation scope.
info@sxyoko.com